English

About SPIL

About SPIL

Milestones

2025

Sep

Won the "TSAA Taiwan Sustainability Action Award" and the "National Corporate Environmental Protection Award"

Jan

Tan Ke facility was completed and put into operation-Chairman C. W. Tsaiand CEO Jensen Huang of NVIDIA jointly unveiled the plaque

2024

Dec

Passes AI-Optimized Chiller Energy Efficiency Solution in Zhong ke Facility

Dec

Purchased Houli Facility in Taichung Science Park from Newmax Technology to expand capacity of Zhong Ke Facility

Dec

Passes Taiwan Intellectual Property Management System (TIPS) A Class certification

Oct

Entire plant of SPIL had passed the ISO 50001 Energy management systems certification

Oct

Purchased Yunlin Douliu Plant in Taichung Science Park from Ming Hwei Energy to expand capacity of Zhong Ke

Jan

Lease additional land from the Central Taiwan Science Park to expand capacity of Zhong ke Erlin Facility.

2023

Dec

Mass production of advanced packaging in large-size chip module of 2.5D heterogeneous integration platform.

Dec

Passed ISO 46001 water efficiency management system certification.

Sep

Established a subsidiary, Siliconware Precision Malaysia Sdn. Bhd.

Apr

Passed GSMA SAS UP certification.

Feb

Siliconware Technology (SuZhou) Limited passed the ISO 22301 Business Continuity Management System Certification.

Jan

Completed and activated Er Lin facility.

2022

Jul

Invested in Huwei Park of the Central Science Park, named Hu Ke facility.

May

The scope of IT product security certification (CC EAL 6+) was extended from Zhong ke facility to Keya East facility

Apr

Cooperate with HSBC (Taiwan) Bank and Taipei Fubon Bank to sign a sustainable index-linked loan for ESG

Apr

Entire plant of SPIL had passed the ISO SAE 21434 automotive cybersecurity certification.

Feb

28GHz/39GHz 5G mmWave package module with discrete antenna structure in mass production

2021

Oct

Procurement of new plant at Taichung Tanzi Technology Industrial Park, named Tan Ke facility

Apr

Invest in Erlin Science Park of Central Taiwan Science Park, named Zhong Ke II facility

Mar

Advanced Package FO-EB Platform Mass Production

2020

Nov

Awarded for the “Operation Continuity Practice Award” by British Standards Institute

Oct

Disposed Siliconware Electronics (Fujian) Co., Limited

Jan

Passes ISO 22301 Business Continuity Management certification

2019

Jul

Purchased Plant II in Taichung Science Park from Genius Electronic Optical Co., Ltd to expand capacity of Zhong Ke Facility

2018

Nov

Awarded for the "Taiwan Corporate Sustainability Report Awards

Apr

SPIL and ASE jointly established ASE Technology Holding Co., Ltd., and each became wholly owned subsidiaries of the holding company

2017

Dec

Hsin Chu Sites were certiid by CC EAL 6+ (Common Criteria Evaluation Assurance Level 6+)

Nov

The Anti-Monopoly Bureau of the Ministry of Commerce of PRC conditionally approved the application in respect of the merger participated by a new holding company established by ASE and SPIL through share exchange.

Jul

Set up Siliconware Electronics (FuJian) Co., Limited

2016

Sep

Production line of Building B of Chung Shan facility obtained IT product safety certification (CC EAL 6+)

Jul

The Ministry of Economic Affairs awarded SPIL the Ministry of Economic Affairs award for being top 10 exporter in 8 years consecutively

Jun

Zhong Ke facility obtained IT product safety certification (CC EAL 6+)

Jun

SPIL and ASE signed the “Joint Share Exchange Agreement.” SPIL will exchange shares with ASE’s new holding company

Apr

Received award as an excellent corporation at the Corporate Governance Evaluation for two consecutive years

2014

Oct

Issuance of Euro Convertible Bonds

Aug

Procurement of third plant in Taichung at Taichung Science Park

2013

Nov

Introduced ISO50001 energy management system and passed certification

2012

Nov

Awarded for Authorized Economic Operator by Tariff Bureau, Ministry of Finance

Aug

Siliconware Technology (SuZhou) Limited passed clean production certification

2011

Oct

Collaborate with industry-leading firms to develop advanced technology, such as TSV, 2.5D, 3D IC, etc.

Sep

Introduced PAS 2050 verification system for certain products and passed certification

2010

Nov

Monthly production of copper-based process packaging services exceeded 100 million chips; customers come from communication, consumer and e-network sectors, etc.

2009

Nov

Procurement of new testing plant at Hsinchu Science Park, named Hsin Chu III facility

Aug

Merged with Siliconware Investment Company Ltd.

2008

Nov

Introduced CNS15506 Taiwan Occupational Safety and Health Management System and passed certication

Aug

QC 080000 (IECQ HSPM) certification

2007

Jul

Completed and activated Chang Hua facility

2004

Dec

Introduced OHSAS 18001 Certication system and passed certification

Feb

Issuance of Euro Convertible Bonds

2003

Aug

TS16949 certification

Mar

Passed Sony Corporation’s Green Partner qualification

2002

Jan

Issuance of Euro Convertible Bonds

2001

Dec

Found Siliconware Technology (SuZhou) Limited

2000

Dec

Merged with Siliconware Corporate and founded Hsin Chu II facility

Sep

Completed and activated Chung Shan facility

Jun

Issuance of ADRs; NASDAQ: SPIL

1999

May

Introduced ISO 14001 EMS International Certification system and passed certification

Jan

QS 9000 certification

1997

Jul

Issuance of Euro Convertible Bond

1995

Dec

SPIL Headquarters moved to Da Fong facility

Oct

Completed construction of Da Fong facility in Taichung

Oct

Issuance GDRs

1993

Apr

Stock began trading on Taiwan Stock Exchange: TAIEX: 2325

Apr

Completed and activated Hsin Chu I facility

Jan

ISO 9001 certification

1989

Aug

SPIL became a public company

1988

Feb

Completed and activated Tan Fu facility

1984

Aug

Began operations in its first factory

May

Siliconware Precision Industries Co., Ltd (SPIL) founded

top

TOP