About SPIL
Milestones
2025
Sep
Won the "TSAA Taiwan Sustainability Action Award" and the "National Corporate Environmental Protection Award"
Jan
Tan Ke facility was completed and put into operation-Chairman C. W. Tsaiand CEO Jensen Huang of NVIDIA jointly unveiled the plaque
2024
Dec
Passes AI-Optimized Chiller Energy Efficiency Solution in Zhong ke Facility
Dec
Purchased Houli Facility in Taichung Science Park from Newmax Technology to expand capacity of Zhong Ke Facility
Dec
Passes Taiwan Intellectual Property Management System (TIPS) A Class certification
Oct
Entire plant of SPIL had passed the ISO 50001 Energy management systems certification
Oct
Purchased Yunlin Douliu Plant in Taichung Science Park from Ming Hwei Energy to expand capacity of Zhong Ke
Jan
Lease additional land from the Central Taiwan Science Park to expand capacity of Zhong ke Erlin Facility.
2023
Dec
Mass production of advanced packaging in large-size chip module of 2.5D heterogeneous integration platform.
Dec
Passed ISO 46001 water efficiency management system certification.
Sep
Established a subsidiary, Siliconware Precision Malaysia Sdn. Bhd.
Apr
Passed GSMA SAS UP certification.
Feb
Siliconware Technology (SuZhou) Limited passed the ISO 22301 Business Continuity Management System Certification.
Jan
Completed and activated Er Lin facility.
2022
Jul
Invested in Huwei Park of the Central Science Park, named Hu Ke facility.
May
The scope of IT product security certification (CC EAL 6+) was extended from Zhong ke facility to Keya East facility
Apr
Cooperate with HSBC (Taiwan) Bank and Taipei Fubon Bank to sign a sustainable index-linked loan for ESG
Apr
Entire plant of SPIL had passed the ISO SAE 21434 automotive cybersecurity certification.
Feb
28GHz/39GHz 5G mmWave package module with discrete antenna structure in mass production
2021
Oct
Procurement of new plant at Taichung Tanzi Technology Industrial Park, named Tan Ke facility
Apr
Invest in Erlin Science Park of Central Taiwan Science Park, named Zhong Ke II facility
Mar
Advanced Package FO-EB Platform Mass Production
2020
Nov
Awarded for the “Operation Continuity Practice Award” by British Standards Institute
Oct
Disposed Siliconware Electronics (Fujian) Co., Limited
Jan
Passes ISO 22301 Business Continuity Management certification
2019
Jul
Purchased Plant II in Taichung Science Park from Genius Electronic Optical Co., Ltd to expand capacity of Zhong Ke Facility
2018
Nov
Awarded for the "Taiwan Corporate Sustainability Report Awards
Apr
SPIL and ASE jointly established ASE Technology Holding Co., Ltd., and each became wholly owned subsidiaries of the holding company
2017
Dec
Hsin Chu Sites were certiid by CC EAL 6+ (Common Criteria Evaluation Assurance Level 6+)
Nov
The Anti-Monopoly Bureau of the Ministry of Commerce of PRC conditionally approved the application in respect of the merger participated by a new holding company established by ASE and SPIL through share exchange.
Jul
Set up Siliconware Electronics (FuJian) Co., Limited
2016
Sep
Production line of Building B of Chung Shan facility obtained IT product safety certification (CC EAL 6+)
Jul
The Ministry of Economic Affairs awarded SPIL the Ministry of Economic Affairs award for being top 10 exporter in 8 years consecutively
Jun
Zhong Ke facility obtained IT product safety certification (CC EAL 6+)
Jun
SPIL and ASE signed the “Joint Share Exchange Agreement.” SPIL will exchange shares with ASE’s new holding company
Apr
Received award as an excellent corporation at the Corporate Governance Evaluation for two consecutive years
2014
Oct
Issuance of Euro Convertible Bonds
Aug
Procurement of third plant in Taichung at Taichung Science Park
2013
Nov
Introduced ISO50001 energy management system and passed certification
2012
Nov
Awarded for Authorized Economic Operator by Tariff Bureau, Ministry of Finance
Aug
Siliconware Technology (SuZhou) Limited passed clean production certification
2011
Oct
Collaborate with industry-leading firms to develop advanced technology, such as TSV, 2.5D, 3D IC, etc.
Sep
Introduced PAS 2050 verification system for certain products and passed certification
2010
Nov
Monthly production of copper-based process packaging services exceeded 100 million chips; customers come from communication, consumer and e-network sectors, etc.
2009
Nov
Procurement of new testing plant at Hsinchu Science Park, named Hsin Chu III facility
Aug
Merged with Siliconware Investment Company Ltd.
2008
Nov
Introduced CNS15506 Taiwan Occupational Safety and Health Management System and passed certication
Aug
QC 080000 (IECQ HSPM) certification
2007
Jul
Completed and activated Chang Hua facility
2004
Dec
Introduced OHSAS 18001 Certication system and passed certification
Feb
Issuance of Euro Convertible Bonds
2003
Aug
TS16949 certification
Mar
Passed Sony Corporation’s Green Partner qualification
2002
Jan
Issuance of Euro Convertible Bonds
2001
Dec
Found Siliconware Technology (SuZhou) Limited
2000
Dec
Merged with Siliconware Corporate and founded Hsin Chu II facility
Sep
Completed and activated Chung Shan facility
Jun
Issuance of ADRs; NASDAQ: SPIL
1999
May
Introduced ISO 14001 EMS International Certification system and passed certification
Jan
QS 9000 certification
1997
Jul
Issuance of Euro Convertible Bond
1995
Dec
SPIL Headquarters moved to Da Fong facility
Oct
Completed construction of Da Fong facility in Taichung
Oct
Issuance GDRs
1993
Apr
Stock began trading on Taiwan Stock Exchange: TAIEX: 2325
Apr
Completed and activated Hsin Chu I facility
Jan
ISO 9001 certification
1989
Aug
SPIL became a public company
1988
Feb
Completed and activated Tan Fu facility
1984
Aug
Began operations in its first factory
May
Siliconware Precision Industries Co., Ltd (SPIL) founded